S77 / preparation-before-delivery
Preparation before delivery
What must be prepared before the delivery period starts?
Preparation is real work with its own scope, timing and agreement; it must not disappear inside the delivery promise.
Open the complete layoutRead the storyboardRead the slot contract
Open the different-count scenario · Its exact content slots
The audience change
Before
The reader assumes delivery begins immediately or that all preparatory work is implicitly included.
After
The reader can distinguish readiness work, delivery phases and the conditions for moving between them.
A fictional mobile-library pilot needs route access, a staffed rota and lending rules agreed before its delivery trial starts.
Fictional teaching scenario, not observed results or an approved operating plan. Phase widths are ordinal, not elapsed time. The example specifies no fee or service duration. Any later dated version needs consistent spans and a new review.
What carries the story
Headline: Prepare before the trial starts.
Substance: The preparation boundary remains visible, while the three lanes distinguish a prerequisite, the main service and continuous coordination.
Closing beat: Agree readiness and preparation costs before delivery begins.
Copy says: Preparation is real work with its own scope, timing and agreement; it must not disappear inside the delivery promise.
The diagram adds: Phase-aligned bars make a readiness-only lane, delivery-only lane and continuous support visibly different; each bar also names its phase range.
Together: The reader can distinguish readiness work, delivery phases and the conditions for moving between them.
Place it in an argument
Establish first: Agree objectives, scope, responsibilities and what readiness means.
Then: Resolve the preparation agreement and approve the start condition before scheduling delivery.
Possible next headline: Approve the readiness check before setting a delivery start.
Conditional route: If the readiness condition is unmet, shift the delivery start explicitly; do not silently consume the delivery window.
Choose this treatment deliberately
S77 phase grid and spanning workstreams, with an explicit readiness boundary and text phase labels on every bar.
Alternative: S89 Chronology Allows more explanation of each milestone, but loses the overlap between continuous support and delivery. Use when event sequence is the main question.
Three ordinal phases in these examples; repeatable workstreams have explicit start and end phases.
Required evidence
- A readiness definition and decision owner.
- A bounded delivery window distinct from preparation.
- Agreement about preparation cost and scope.
- Actual spans for every proposed workstream.
Must survive
- Preparation precedes delivery and is not automatically free.
- Phase labels and bars use one consistent time basis.
- Continuous support differs from a one-off launch activity.
- A plan does not establish acceptance or completed delivery.
A poor fit when
- A critical-path schedule needing task-level dependencies.
- Unequal-duration phases shown as equal elapsed time without disclosure.
- A hidden pre-start commitment.
Actual content slots
| Slot | Contribution | Count |
|---|---|---|
| eyebrow | Identify this as fictional teaching material. | 1 |
| headline | State the communication point and its relevance. | 1 |
| closing | Land the implication or prepare the next unit. | 1 |
| qualification | Keep evidence status and material limitations visible. | 1 |
| phases | Ordered preparation and delivery phases, not equal durations. | 3 |
| lanes | Workstream, explicit phase range and bounded activity. | 3 |
| readiness | The condition that allows delivery to begin. | 1 |
Use with AI
Checks, counts and format limits · Batch review
Same-agent meaning and privacy review. Render checks are separate; no claim of audience effectiveness. Native editable PowerPoint and PDF remain unverified.